100% Success Rate
We, at Boldwater, are proud to boast a 100% success rate on every project we have consulted. As a permitted entity, we are held to very high standards and we have not only met these standards on every project, but have surpassed them.
A Scientifically Engineered Solution
Every project is unique and therefore we approach each endeavor from an engineering standpoint. We remain flexible for changes and adjust as necessary to not only meet necessary regulatory criteria, but also exceed the goals and cost expectations of our clients. We keep safety foremost on a daily basis and have developed loyal clients and partners in the industry.
Process Comparison
Boldwater's patent pending process is by far the most efficient method in Bio-Remediating hydrocarbon presence in solid waste.
Case Study {JP-4 Jet Fuel Spill) | Burial Site | Boldwater | |
---|---|---|---|
Hydrocarbon Level (Beginning) | 400 mg/kg (0.04%) |
580,000 mg/kg 58% |
287,000 mg/kg 28.7% |
Time Lapsed | 2 Years | 13 Years | 8 Hours |
Hydrocarbon Level (End) |
33 mg/kg - 101 mg/kg (.003% - .001%) |
495,000 mg/kg (49.5%) |
10,600 mg/kg (1.06%) |
Treatment | Soil Vapor Extraction & Bioventing | Natural Degradation | Specialized Enzyme Treatment |